Decking, paving and grounds

Outdoor living areas, paths, walls and everything around the house.

After — timber deck

Before any outdoor surface is laid, the water is dealt with: where the rain runs, where it goes, and what falls are needed. A handsome deck with water sitting underneath lasts three years.

What is included

  • Drainage and falls
  • Timber and composite decking
  • Portuguese paving, setts and flagstones
  • Walls, planters and outdoor steps
  • Buried irrigation and lighting services
Excavation and ground preparationDuring — building the outdoor stepsAfter — outdoor area finishedAfter — outdoor steps finished in stoneAfter — deck finishedAfter — timber deckDuring — concrete retaining wallGround preparation and materials on site

Request a quote

We come to the site, take measurements and give you a detailed quote broken down by section. No cost, no obligation.

We reply within one working day. If it is urgent, call us.

WhatsApp