Plumbing

New water and waste, pressure-tested before anything is closed up.

Water and waste pipework in the wall

Multilayer pipe for water, PVC for waste, with the right falls and access to every trap. Before the wall is closed the system is pressure-tested — it is the only way to be sure there is no hidden leak.

What is included

  • Hot and cold water in multilayer pipe
  • PVC waste with proper falls and venting
  • Pressure testing before the walls are closed
  • Cylinders, water heaters and recirculation
  • Fitting of sanitaryware, taps and shower trays
Water and waste runs opened up in the floorCutting and running pipework through a brick wallDetail of a water and waste connectionWater supply: the run in the wallPipework set into a masonry wallWater and waste pipework in the wall

Request a quote

We come to the site, take measurements and give you a detailed quote broken down by section. No cost, no obligation.

We reply within one working day. If it is urgent, call us.

WhatsApp